general

Owabi treatment plant shutdown disrupts water supply to parts of Ashanti Region

Owabi treatment plant shutdown disrupts water supply to parts of Ashanti Region

Residents in several communities in the Ashanti Region are expected to experience water supply interruptions after Ghana Water Limited (GWL) temporarily shut down the Owabi Water Treatment Plant following heavy rainfall. The affected areas include Asuoyeboah, Tanoso, Apatrapa, Pokukrom, Bokankye, Nyankyereniase, Esaase, Akropong, Mfensi, Twedie, Abuakwa, Maakro, Mim, Nkwakom, Nkawie, Toase, Afari, Wioso, Mpasatia, Abrepo Asuobonteng and Bronikrom.

Residents in several communities in the Ashanti Region are expected to experience water supply interruptions after Ghana Water Limited (GWL) temporarily shut down the Owabi Water Treatment Plant following heavy rainfall.

The shutdown, which took effect at 10:00 a.m. on Thursday, November 12, was necessitated by large volumes of sediment washed into the plant’s water source by the rains.

GWL’s management in the Ashanti Region said the treatment facilities required emergency cleaning to restore normal operations and safeguard the quality of water supplied to consumers.

The affected areas include Asuoyeboah, Tanoso, Apatrapa, Pokukrom, Bokankye, Nyankyereniase, Esaase, Akropong, Mfensi, Twedie, Abuakwa, Maakro, Mim, Nkwakom, Nkawie, Toase, Afari, Wioso, Mpasatia, Abrepo Asuobonteng and Bronikrom.

Parts of Bohyen, the Military Barracks and other communities served by the facility are also expected to experience disruptions.

The company says the cleaning exercise is scheduled to be completed on Friday, November 13, after which production will resume.

However, water supply will be restored gradually as the distribution network stabilises.

GWL apologised for the inconvenience and asked customers in the affected communities to be patient while the emergency maintenance work is completed.

  • water
  • treatment
  • plant
  • supply
  • ashanti
  • region
  • owabi
  • shutdown

Summaries and tags are generated automatically. Stay informed with VidiaNews.

Related news

Owabi water treatment plant shut down after heavy rains disrupt production
business

Owabi water treatment plant shut down after heavy rains disrupt production

The affected communities include Asuoyeboah, Tanoso, Apatrapa, Pokukrom, Bokankye, Nyankyereniase, Esaase, Akropong, Mfensi, Twedie, Abuakwa, Maakro, Mim, and Nkwakom. Others are Nkawie, Toase, Afari, Wioso, Mpasatia, Abrepo Asuobonteng, Bronikrom, Part of Bohyen, Military Barracks, and surrounding communities supplied by the Owabi Water Treatment Plant.

Read →
Western rail line to be extended to Nyinahin in Ashanti, and Hamile in Upper West – Finance Minister
politics

Western rail line to be extended to Nyinahin in Ashanti, and Hamile in Upper West – Finance Minister

Finance Minister Dr Cassiel Ato Forson has announced plans to commence an expansion of the railway line from Takoradi to Nyinahin in the Ashanti Region in 2027, as part of a broader strategy to expand Ghana’s railway network, support mineral processing and position the Takoradi Port as a major trade gateway to the Sahel. Dr Forson also announced plans to develop the Takoradi Port as Ghana’s principal maritime gateway to the Sahel, strengthening the country’s position as a regional logistics and trade hub.

Read →
Ghana to establish 24-hour minerals processing enclave in Western Region – Ato Forson
politics

Ghana to establish 24-hour minerals processing enclave in Western Region – Ato Forson

The government has announced plans to establish a 24-hour critical minerals processing enclave in the Western Region as part of efforts to boost local value addition and reduce the export of raw minerals. “Mr Speaker, we will build a 24-hour critical-minerals processing enclave in the Western Region,” he told Parliament on Thursday, November 12, in the 2027 budget statement reading.

Read →