Arunachal Adi bodies petition Amit Shah against Siang mega dam project

The Adi Ba:né Kébang United and Siang Indigenous Farmers’ Forum said the 45-year-old hydropower project plan was rejected twice before being revived in 2024
A drone view shows Adi community settlements which are at risk of submersion if the proposed 11,500 MW Siang Upper Multipurpose Dam Project is completed in Arunachal Pradesh.
The Adi Ba:né Kébang United (ABKU), the apex council of the Adi tribe, and the Siang Indigenous Farmers’ Forum (SIFF) on Friday (November 20, 2026) submitted a memorandum to Union Home Minister Amit Shah, demanding that no dam be built over the Siang River in Arunachal Pradesh.
ABKU president Dijhi Tamuk and general secretary Jirbo Jamoh signed the memorandum along with SIFF president Nobeng Burang and general secretary Likeng Libang. It said that the proposed 11,200-megawatt Siang Upper Multipurpose Project (SUMP) will affect the Adis the most.
If executed, SUMP will be India’s biggest dam.
The two organisations said the Siang dam, a 45-year-old idea, was rejected twice by previous governments before being revived in 2024. They alleged that the pre-feasibility report (PFR) activity, undertaken by the State government and NHPC Limited, began without proper consultation, transparency or plans for rehabilitation, alternate farmland or livelihoods.
The ABKU-SIFF petition accused the authorities of using misleading promises, fear of a “Chinese water bomb”, temptation and divide-and-rule tactics to push the PFR despite still resistance from locals. It alleged intimidation through the deployment of central forces, mass arrests of youths and misuse of the Arunachal Pradesh Unlawful Activities (Prevention) Act against the protestors.
The organisations cited reports to claim that detained anti-SUMP activists were tortured in custody.
They also pointed to “contradictory statements” by Chief Minister Pema Khandu and MP Tapir Gao. While the former assured that no dam would be built without public consent, the latter, along with Minister Ojing Tasing and some Adi MLAs, said the dam would go ahead.
The ABKU-SIFF clarified that they were not opposed to development and would accept smaller dams on the tributaries of the Siang, which the Adis revere as a mother.
The organisations listed a set of demands, which include the release of detained youths, withdrawal of FIRs against protestors, a halt to the PFR work, withdrawal of security forces from Upper Siang and Siang districts, clarification of the government’s stand, and a judicial inquiry into the October 23 tear gas and stun grenade firing.
They said they were ready for talks “on equality terms”, but not under pressure.
Arunachal Pradesh / government / public works & infrastructure
- adi
- siang
- project
- arunachal
- amit
- shah
- mega
- dam





