10 years and doubled cost: The four-laning saga of Mangaluru-Bengaluru NH 75 in Dakshina Kannada and Hassan

The key highway connecting the state capital with coastal Karnataka becomes completely four-lane except the 26 km stretch of Shiradi Ghat between Maranahalli and Addahole
A view of the vehicular overpass, part of the newly widened four-lane Mangaluru-Bengaluru NH 75 between BC Road and Addahole at Panemangaluru near Bantwal in Dakshina Kannada district. NHAI will commence toll collection for the 63 km stretch from November 26 at Valalu toll plaza.
In the decadal saga of widening about 115 km stretch of Bengaluru-Mangaluru National Highway 75 between Hassan and B.C. Road in Dakshina Kannada district (excluding the 26-km Shiradi Ghat stretch), the total project cost has close to doubled, from about ₹1,220 crore estimated in the year 2017 to about ₹2,220 crore when the project was almost complete by 2026-end.
While the travel time (by a car) has reduced to about three-four hours between Hassan and Mangaluru from about five hours, road users endured tremendous ordeal during the past decade when the construction was underway, with the project witnessing an almost complete halt between 2018 and 2021. Driving from Mangaluru to Hassan had become a nightmarish experience during this period.
While the Union Road Transport Ministry handed over the highway stretch to the National Highways Authority of India (NHAI) in July 2016 to widen the stretch into a four-lane road, contracts were awarded to M/s Isolux Corson for the Hassan-Maranahalli stretch (about 50 km) at an estimated cost of ₹400 crore and M/s Larsen and Tubro for the Addahole-B C Road stretch (about 65 km) for ₹821 crore in 2017.
Within about 20 months, M/s Isolux declared insolvency and left the Hassan project while M/s Larsen submitted a letter of foreclosure as the NHAI wanted to change the scope of the project and refused to revise the project cost by about ₹140 crore for the changed scope. The Authority spent a good about two years in choosing new contractors for the Dakshina Kannada stretch and arranging the sub-contractor M/s Rajkamal Builders, to continue the Hassan district work.
The abnormally slow pace of construction, notwithstanding Union Road Transport Minister Nitin Gadkari’s claim of constructing about 40 km highway in a day, irritated road users as well as general public in the vicinity of the project highway.
With the contractors seldom following proper construction methods, including providing motorable alternative roads during the construction period, road users struggled to negotiate pothole and crater-ridden highway for years. While clouds of dust engulfed the highway during summer, the stretch was riddled with slush during the rainy season for years. Kalladka Town near B.C. Road where the NHAI built a 3 km elevated road (flyover) due to public demand, suffered massively for almost five years during the construction period.
While the project highway is almost complete except for about 1 km at two places in Dakshina Kannada district, the NHAI needs to take measures to ensure pedestrian safety at many places, including Mani, Uppinangady, Melkar, and other places as the vehicles move at high speed on the newly built wide carriageways.
Road users are also upset at the speed being limited to 80 kmph on the widened section with one user quipping, “Earlier, it was impossible to drive; now we cannot drive.” However, NHAI has justified the restrictions saying the carriageways are designed for those particular limits.
- cost
- saga
- dakshina
- kannada
- hassan
- mangaluru
- bengaluru
- highway

